News

3 November 2010

Fifth tug of the project 90600 delivered to the Russian Federation Navy.

The fifth tug “RB-389” of the project 90600, yard number 925 has been delivered to the Russian Federation Navy. At the present time the tug towage trip has been carried out by inland waterways to the port of Novorossiysk. The tug is planned to be put into operation until the end of this year as part of the Black Sea Fleet.

Main parameters:
Dimensions25,5 х 8,8 m
Main engines2 х 746 kW
Propulsion systemRudder propellers US 155
Bollard pullapprox. 25 tonnes
Ice classArc 4

All news