News

20 August 2010

First tug of the project PE 65 has been launched

The tugboat “Dir” – the first one of the project PE 65 (yard number 501) has been launched. It will be delivered to the owner, Ltd “Primorsk Oil Terminal” until the end of this year.

Main parameters:
Length overall33,5 m
Width overall12.1 m
Depth6 m
Draught4.4 m
Speed13 knots
Bollard pull63 tonnes

All news