News

7 May 2009

Keel-laying of the tug “KLASCO-2” is carried out

Keel-laying of the second tug built under the order of JSC “Klaipeda stevedoring company” has been carried out. The tugboat (Design 16609) will have power of 3370 kW and an ability to develop bollard pool of 55 tons. It will be equipped with both fore and after towing winch and an outer fire-extinguishing installation.

This year open JSC “Pella” plans to accomplish construction of the vessel and to deliver it to the customer ahead of time. The first tugboat “KLASCO-1” was delivered to the customer in 2008 and has since been successfully operated in the port of Klaipeda.

All news