News



5 November 2008
Tugboat «Sevruga» is successfully commissioned to the customerThe delivery protocol for the tug «Sevruga» is signed. The tug was successfully commissioned to the customer - the Ust-Luga Company.read more
30 October 2008
Tug “Urgal” of Pella 16609 design is preparing for a long voyagePella Shipyard is finishing the construction of the tug “Urgal”, the second vessel from the set of tugs for AG “SUEK”. The tug has successfully completed sea trials and as its predecessor t/b “Tugnuy” will go by its own power to the operation area – port Vanino (Far East of Russia). read more
27 October 2008
«Tugnuy» has passed the danger areaThe tug “Tugnuy”, constructed at our shipyard for the AG SUEK company, continues its voyage to the port Vanino. Presently the vessel has passed the Gulf of Aden and now holding its way to the next point of destination at Sri Lanka. The tug is equipped with main engines CAT 3516 with a total power capacity of 4000 h.p.read more
21 October 2008
«KLASKO-1» is commissioned T/b KLASKO-1 was commissioned to the customer and already started to work in the port of Klaipeda. The tug has a total power capacity of 4500 h.p., develops a bollard pull of 55 tonnes ahead, is equipped with forward and aft towing winches, and additionally has FiFi functions.read more
21 October 2008
The tug Grifon-7 has been launched Launching of the tugboat Grofon-7, the second tug that was built for the towage company “Grifon Ltd”. The tug of total capacity of 2388 kW is prepared for operation under hard ice conditions. During November it will be commissioned to the customer.read more
     |  44  |  45  |  46  |  47  |  48  |  49  |  50  |  51  |  52  |  53