News

26 September 2008

«Tugnuy» has completed the first half of its journey

A month after its departure from the port of St. Petersburg, the  tug, constructed at our shipyard for the SUEK company ( t/b «Tugnuy» of Pella 16609 design), has reached the  port of Said (Suez canal). The tug, equipped with main engines CAT 3516 with a  total power capacity of 4000 h.p., follows its course to the  port of Vanino (Far East of Russia). A similar delivery was made last year with t/b «Bikin» of Pella 16609 design. At present, the «Bikin» is being operated by the Rosneft Oil Company in the port of Nakhodka.

All news